Installation · Guide
Adding more solar panels to an existing system
Yes, you can usually add panels to an existing solar system. Whether they join the old ones or go in as a separate array depends on your inverter, your roof and your grid connection. If you’re on the feed-in tariff, it also has to be done in a way that protects those payments.
Mon–Fri 9:00am–5:00pm · Clear written quote before any work starts
Talk to us about solar, batteries or repairs.
Call 0800 156 0191, Monday to Friday, 9:00am–5:00pm, or send us a message through our contact page.
MCS certified
NAPIT registered
TrustMark approved
Fully insured
England, Wales & southern Scotland
Why add more
Why people add panels.
Here are the options, the limits, and what happens to your feed-in tariff and export payments.
- An electric car that can charge from daytime solar.
- A heat pump, which raises your electricity use.
- A battery, which needs enough spare solar to fill it. See what size solar battery do I need?
- A small first system that no longer covers what the house uses.
Options
Your options.
- Add panels to the existing inverter, if it has spare capacity and a free input. This is the simplest route, but only works if the new panels suit the inverter and the old panels.
- Add a second array with its own inverter. The new panels run separately from the old system, which keeps the two apart for metering and the feed-in tariff.
- Add panels with a hybrid inverter and a battery. The new inverter runs the new panels and the battery together. See hybrid inverters explained.
Limits
Technical limits.
- The inverter’s input limits. Every inverter has a maximum input voltage, current and power, and a set number of inputs. These usually decide whether new panels can share it.
- Old and new panels on the same string. Panels wired together work at the level of the weakest one, so mixing a new, more powerful panel with old ones wastes some of its output. New panels usually go on their own string or input.
- Roof space and shading. The best part of the roof may already be used. See best direction and angle for solar panels.
- The rest of the system. The cables, isolators and fuse board connection have to suit the extra power.
Grid rules
Grid rules: G98 and G99.
- Up to 16 amps per phase (about 3.68kW on a normal single-phase supply), an installer can connect and tell the network operator within 28 days. This is called G98.
- Above that, permission is needed first, through a G99 application to the network operator. See G98 and G99 explained.
- Your existing panels count towards the total. Adding to a 3kW system usually takes the total over the G98 limit.
- Export limiting is an option. If the network can’t take more export, a device can cap it, so you use more of the extra solar yourself.
Feed-in tariff
The feed-in tariff.
- New panels don’t get the feed-in tariff. Ofgem’s rule is that any extension commissioned on or after 15 January 2016 isn’t eligible, for generation or export.
- Your original system keeps its feed-in tariff, as long as the extension is set up properly.
- Tell your FIT supplier before or when you extend. It’s a condition of the scheme.
- Keep the new panels off the FIT generation meter. If they share it, Ofgem says payments have to be split by capacity. Its example: a 40kW system extended by 10kW is only paid on 80% of what it makes. Separate metering, or wiring the new array after the FIT generation meter, avoids that.
- Deemed export can change. If you’re paid FIT export on an estimate and an export meter is fitted for the new panels, your export may have to be metered instead. Ask your FIT supplier before the work. See feed-in tariff rates 2026/27.
Export
Export payments for the new panels.
- Two routes where the new panels share an export meter with a FIT system: opt out of FIT export and take a Smart Export Guarantee tariff for the whole system, or don’t claim SEG for the new panels and keep FIT export spread across the whole system.
- You can’t be paid FIT export and SEG for the same panels.
- SEG needs certification and a meter that records export. Use an MCS certified installer for the extension so you have the certificate. See the Smart Export Guarantee explained.
Planning
Planning.
Extra panels on a house roof are usually permitted development, within the same limits as the original ones. See do you need planning permission for solar panels?
How we help
How we help.
We add panels to existing systems, whoever installed the first one, across England, Wales and southern Scotland, with our own MCS certified engineers. We check the inverter, the roof and the grid connection, sort out the G98 or G99 paperwork, set up the metering so your feed-in tariff is protected, and give you a clear written quote before any work starts.
Sources: Ofgem, Feed-in Tariffs guidance for installations (extensions, paras 6.7–6.12) and FIT guidance for licensed electricity suppliers V17.3; Ofgem SEG guidance for generators; MCS, notifying DNOs; network operators’ G98, G99 and export limitation guidance; Energy Saving Trust.
Questions
The things people ask before they ring.
Not answered here? Call 0800 156 0191, Monday to Friday, 9:00am–5:00pm.
Can I add more solar panels to my existing system?
Usually, yes. They either join your existing inverter, if it has room and a suitable input, or go in as a separate array with their own inverter.
Will adding solar panels affect my feed-in tariff?
Your original panels keep their feed-in tariff if the extension is metered separately or wired after the FIT generation meter. The new panels don’t get the feed-in tariff. Tell your FIT supplier about the change.
Can I mix old and new solar panels?
Not usually on the same string, because the string runs at the level of its weakest panel. New panels normally go on their own string, input or inverter.
Do I need permission from the network operator to add panels?
If the total, old and new together, goes over 16 amps per phase (about 3.68kW on a single-phase supply), the installer applies under G99 before connecting. Below that, they tell the network operator within 28 days.
Can I get paid for the export from the new panels?
Yes, through the Smart Export Guarantee. You can’t be paid FIT export and SEG for the same panels, so where old and new share an export meter, Ofgem sets out two ways to handle it.
Ready when you are
Thinking about adding panels?
We’ll call you back to talk it through, and you get a clear written quote before any work starts. Mon–Fri 9:00am–5:00pm.