Solar servicing guide

Does my solar PV system need electrical testing?

“Electrical testing” means two different things for a home with solar. An EICR checks the fixed wiring of the house, including the circuit that serves your solar system. The panel side has its own tests, which a solar specialist carries out.

Mon–Fri 9:00am–5:00pm · Clear written quote before any work starts

Start here

Talk to us about solar, batteries or repairs.

Call 0800 156 0191, Monday to Friday, 9:00am–5:00pm, or send us a message through our contact page.

MCS certified

NAPIT registered

TrustMark approved

Fully insured

England, Wales & Scotland

EICR basics

What an EICR is.

Whether you need either depends on your situation. Landlords have legal duties, sellers and buyers often ask for paperwork, and owner-occupiers can simply choose to have a check done.

  • The name: EICR stands for Electrical Installation Condition Report. A qualified electrician inspects and tests the fixed wiring against BS 7671, the UK wiring regulations.
  • What it records: damage, deterioration, defects, dangerous conditions and anything that no longer meets the regulations.
  • The outcome: if anything dangerous or potentially dangerous is found, the report is marked “unsatisfactory” and the fault needs fixing without delay.
  • What it is not: it is not a check of how well your panels perform. It looks at safety, not output.

Who needs one

Who has to have one.

The rules depend on who lives in the home and where it is.

  • England: private landlords must have the electrical installation inspected and tested at least every 5 years. Tenants must get a copy, and new tenants must receive it before they move in.
  • Wales: landlords must have the electrics tested at least every 5 years. The contract-holder gets a copy within 14 days of moving in.
  • Scotland: private landlords must have an inspection at intervals of no more than 5 years. The landlord keeps a copy for six years.
  • Homeowners living in the property: there is no legal duty. Electrical Safety First suggests a check roughly every 10 years.

Landlords should check the current government guidance for their nation, as these rules have changed in recent years.

Solar and testing

Where solar fits in.

A solar system has two sides, and the testing is different for each.

  • The AC side: this is the mains-voltage wiring from the inverter to your consumer unit (fuse board). Government guidance for England says the inspection covers “circuits provided for specialist equipment such as solar PV systems and battery storage”. So the solar circuit and its protective devices sit within a normal EICR.
  • The DC side: this is the panels, the cables running to the inverter and the isolator. It carries live voltage whenever there is daylight. The same guidance says a separate inspection by an appropriately qualified person may be needed for specialist items like solar PV.
  • The solar tests: the standard for this is IEC 62446-1. Its tests include polarity (are the cables connected the right way round), open-circuit voltage and string current (does each group of panels produce what it should), and insulation resistance (is the cable insulation still sealing in the current). The same DC testing can be used for periodic checks.

In practice, many electricians treat an EICR as covering the AC side up to the solar isolation switch. Ask whoever does your EICR to state on the report exactly what was and wasn’t included. If the roof side wasn’t tested, you will know to book that separately.

If a test points to a panel-side fault, such as an isolation fault or a tripping RCD, that is a repair job for a solar engineer.

Paperwork

When someone asks for paperwork.

  • Landlords and letting agents: you need a valid EICR for the property. Tell the electrician there is a solar system, so its circuit is included. Keep the solar installation paperwork alongside it, including the MCS certificate. If it’s missing, see what to do if you’ve lost your MCS certificate.
  • Selling a home: an EICR is not a legal requirement to sell. Buyers’ solicitors often ask for the solar documents, though. See buying or selling a house with solar panels.
  • Insurers: some insurers ask what checks have been done on a solar system, so read your policy wording. Our page on solar panel insurance explains what to look for.

Service vs EICR

How often, and what a service covers.

For the house wiring, the usual guide is every 5 years for a rented home (or at each change of tenant, whichever is sooner) and about every 10 years for an owner-occupied one. The electrician can recommend a shorter gap.

For the solar system itself, there is no fixed legal interval for homeowners. The Energy Saving Trust says solar needs little day-to-day attention, and that your installer should leave written details of the maintenance checks to carry out. Your inverter manual and handover pack are the best guide to what your manufacturer recommends.

A solar service and an EICR do different jobs:

  • An EICR covers the whole house’s fixed wiring and gives you a compliance report.
  • A solar service looks at the PV system: panels, mounting, cabling, inverter and monitoring. Our engineers test the PV system as part of a service.

Many owners pick a regular service to catch problems early. See solar panel maintenance and our wider servicing pages.

How we help

How we help.

Our own engineers service and test solar systems fitted by any installer, across England, Wales and southern Scotland. We can issue a solar PV test report to IEC 62446-1 and an electrical installation condition report (EICR). If a check finds a fault on the panel side, we can repair it, including inverters, isolators and cabling. You get a clear written quote before any work starts.

Sources: GOV.UK; Scottish Government; Welsh Government; Electrical Safety First; NICEIC; BSI.

Questions

The things people ask before they ring.

Not answered here? Call 0800 156 0191, Monday to Friday, 9:00am–5:00pm.

Do solar panels need an EICR?

Only if you rent the property out, in which case the whole installation, including the solar circuit, falls under the landlord’s 5-year duty. Homeowners have no legal requirement, though a periodic check is sensible.

Does an EICR test the panels on my roof?

Usually not. An EICR is a wiring inspection, and the AC side is the part it normally covers. The panel and DC side is tested to IEC 62446-1 by a solar specialist. Ask for the report to state what was included.

Do I need an EICR to sell a house with solar panels?

No. It isn’t a legal requirement. Buyers or their solicitors may still ask for the solar paperwork, such as the MCS certificate and any test results.

Can I test my own solar system?

No. The panels and DC cables are live whenever there is daylight, even with the inverter off. Don’t open equipment or touch cables. Use a qualified engineer.

How often should solar panels be checked?

There is no fixed legal interval for homeowners. Follow your inverter manufacturer’s recommendations and your installer’s handover pack, and consider a regular service.

Ready when you are

Want your solar system tested by an engineer?

We’ll call you back to talk it through, and you get a clear written quote before any work starts. Mon–Fri 9:00am–5:00pm.