Inverter repair guide
Replacing an old inverter on a feed-in tariff system: will I keep my FIT payments?
Usually, yes. Ofgem says you can replace equipment on a feed-in tariff (FIT) system, inverter included, without losing your accreditation, as long as the system still meets the scheme rules. In practice that means keeping the system’s capacity the same and making sure your generation meter still records only what your panels make.
Mon–Fri 9:00am–5:00pm · Clear written quote before any work starts
Talk to us about solar, batteries or repairs.
Call 0800 156 0191, Monday to Friday, 9:00am–5:00pm, or send us a message through our contact page.
MCS certified
NAPIT registered
TrustMark approved
Fully insured
England, Wales & Scotland
Short answer
The short answer.
Inverters tend to wear out well before the tariff ends. The Energy Saving Trust says to replace one after around 12 years, and FIT payments run for up to 20 years (25 if you signed up before August 2012). Here is what to check and who to tell. For the signs one is failing, see how long do solar inverters last?
- Replacing is allowed. Ofgem’s guidance says you may repair or replace some or all of the generating equipment without affecting your accreditation, provided the system still meets the scheme rules. For solar PV, Ofgem lists the panels and the inverters as generating equipment.
- The rules to stay within. It must still be solar, must not be moved or decommissioned, and its metering must still work.
- An increase in capacity is called an “extension”. Extensions commissioned on or after 15 January 2016 don’t earn FIT. Ofgem can change the tariff rate, or withdraw accreditation, if a system has been extended or modified in a way that wouldn’t have been entitled to accreditation.
- Ask in writing. Ofgem says its guidance isn’t a definitive legal guide, and that it can’t pre-approve changes to a system. So ask your FIT supplier before the work and keep their reply.
Capacity
Keep the capacity the same.
Ofgem measures a system by its “total installed capacity”: the most it could run at for a sustained period without damage. It usually took the rating of the generating equipment as that figure.
- Like for like is the safe route. Same rating, same panels, no extra capacity. Nothing has been extended.
- A bigger inverter: ask first. Ofgem says an extension can come from replacing generating equipment, and it counts inverters as generating equipment. Its guidance doesn’t say how a bigger inverter on the same panels is treated. One supplier, Good Energy, says a 3kW inverter can be swapped for a 5kW one with its permission and the payments carry on. Others may differ, so give yours the old and new ratings before you order.
- Oversizing rarely helps. Ofgem describes the “declared net capacity” of a solar system as normally the lower of the inverter’s maximum AC output and the panels’ maximum DC output. The panels are usually the limit, so a larger inverter on the same panels doesn’t normally add capacity.
- Lower capacity is a “reduction”. Accreditation carries on, but your supplier still needs to know.
- Extra panels at the same time count as an extension. If one meter serves the old and new panels, payments are shared out by capacity. Ofgem’s example: a 40kW system extended by 10kW is paid on 80% of its output. See adding more solar panels.
Meter
Keep the generation meter on the circuit.
- Payments follow the generation meter. Ofgem says FIT payments are based on meter readings, the meter must measure your generation separately from any other source, and estimates can’t be used. The inverter’s screen or app doesn’t count.
- The new inverter’s output must still pass through that meter. Ask your engineer to confirm it is wired in and counting before they leave.
- Tell your supplier if the meter changes. Ofgem says to do so if a generation or export meter is replaced or removed, or starts measuring electricity your panels didn’t generate.
- Photograph the reading before and after. Take the generation meter reading on the day of the swap, from the display only. Don’t open the meter or touch its wiring. See feed-in tariff meter readings.
Paperwork
Who to tell, and what to keep.
- Your FIT supplier. Ofgem says you must notify them of modifications as defined in your Statement of FIT Terms, which always include capacity changes. Check your copy. Even for a like-for-like swap, a short note is sensible: the date, old and new make, model and rating, and your meter readings.
- Your network operator. The ENA’s owner guide says to inform your network operator if you remove or replace your generating unit. Under G98 the installer notifies within 28 days of commissioning. On older systems connected under the previous G83 rules, G98 says replacing a significant item such as an inverter means the system must then meet G98. If the new total goes above 16 amps per phase (about 3.68kW on a single-phase home), you need G99 approval before it goes in. See G98 and G99 explained.
- MCS. None of the Ofgem or MCS pages we read say an inverter swap needs a new MCS certificate for solar PV. MCS does allow the product details on an existing certificate to be amended. It asks for the original installer’s commissioning documents, or a signed letter from a currently certified installer, and only the system owner can request it. See lost your MCS certificate?
- Your own folder. Keep the invoice, the old and new inverter details and serial numbers, the commissioning sheet, the G98 confirmation, the meter photos and your supplier’s reply. Ofgem runs an audit programme, so be able to show what changed and when.
Hybrid
Swapping to a hybrid inverter to add a battery.
A hybrid inverter can also run a battery, so it can look like a good swap when the old inverter fails. Ofgem says a battery can be added without affecting accreditation. The catch is the meter.
- The battery shares the inverter, so its output passes the generation meter and how it charges matters.
- Ofgem’s examples: payments can carry on if the battery charges only from the panels, or if the generation meter is an approved bi-directional one that works out the net figure. With standard meters and grid charging, its example says generation payments could not be made.
- Tell your supplier before the work, with an updated wiring diagram and meter readings.
- A battery adds to your grid total, so G99 may apply even if the solar alone was under G98.
For the details, see hybrid inverters explained and will a battery affect my FIT payments?
How we help
How we help.
We replace and repair inverters on systems fitted by any installer, across England, Wales and southern Scotland, often within the same week, using our own engineers. We check the new rating against the old, make sure the generation meter is still counting, take before-and-after readings and handle the G98 notification. We write to your FIT supplier with the old and new inverter details and your meter readings. As an MCS certified installer for solar PV, we can also provide the signed installer letter MCS accepts when the product details on a certificate need amending. You get a clear written quote before any work starts. See inverter repair.
Sources: Ofgem; Energy Networks Association; MCS; Energy Saving Trust; Which?; Good Energy.
Questions
The things people ask before they ring.
Not answered here? Call 0800 156 0191, Monday to Friday, 9:00am–5:00pm.
Will replacing my inverter stop my feed-in tariff?
Not if the system still meets the scheme rules: capacity doesn’t increase, the system stays in place and the generation meter still records your generation.
Do I have to tell my FIT supplier when I replace my inverter?
Ofgem says you must notify them of modifications as defined in your Statement of FIT Terms, which always include capacity changes. Check your terms. A short note with the old and new inverter details and your meter readings is a sensible record either way.
Can I fit a bigger inverter on a feed-in tariff system?
Ask your FIT supplier first. Ofgem’s guidance doesn’t say how a bigger inverter on the same panels is treated, and suppliers may differ. Extra panels are different: they earn no FIT.
Do I need a new MCS certificate for a new inverter?
We found nothing from Ofgem or MCS saying you do. MCS lets the product details on an existing certificate be amended, using the original installer’s documents or a letter from a currently certified installer.
Do I need to tell my network operator about a new inverter?
Yes. The installer notifies them under G98 within 28 days of commissioning. If the new inverter or a battery takes your total above 16 amps per phase, G99 approval is needed first.